All NewsEducationTV
Equities & FundsCrypto & Digital AssetsAI & TechnologyBusiness & CorporateUS Politics & PolicyGeopolitics & Global RiskMacro, Rates & FXCommodities & EnergyEuropean Politics & MarketsAsia-PacificReal Estate & Property
All NewsHome
← Back to Commodities & Energy

US Builds Energy Foothold in Iraq with New LNG Project

Created at 19 Aug · 12:26 AM1 source↑ Market-relevant
IN SHORT

The U.S. is quietly establishing an energy presence in Iraq through Excelerate Energy's development of the country's first LNG import terminal. The project aims to reduce Iran and China's influence in Iraq and bolster U.S. energy diplomacy in the Middle East.

Key Numbers

February 14, 1945Date of Roosevelt-King Abdulaziz energy agreement
October and November 1973Dates of Nixon-Kissinger meetings on oil power
2011Year of Trump-Obama White House Correspondents' Dinner
Q2 2027Projected start date for LNG terminal operations
$450 millionInitial budget for the LNG project
500 millionMMscf/d guaranteed regasification capacity
250 millionMMscf/d minimum daily take commitment by Iraq
2003Year of Saddam Hussein's toppling
1979Year of Iran's Islamic Revolution
September 3, 2019Date of Iran-China 25-Year Comprehensive Cooperation Agreement reveal
2019Year of 'Oil for Reconstruction and Investment' agreement
2021Year of 'Iraq-China Framework Agreement'
February 24, 2022
Date of Russia's invasion of Ukraine
3 to 5 yearsEstimated repair time for Qatar's North Dome gas facilities
18 Bcf/dUS daily LNG export processing capacity
2031Projected year for US LNG export capacity doubling

Who's Involved

Franklin D. Roosevelt
U.S. President involved in 1945 energy agreement with Saudi Arabia
King Abdulaziz bin Abdul Rahman Al Saud
Saudi King involved in 1945 energy agreement with the U.S.
Richard Nixon
U.S. President involved in 1973 oil crisis strategy meetings
Henry Kissinger
U.S. Secretary of State and National Security Advisor during 1973 oil crisis
Donald Trump
Subject of a 2011 White House Correspondents' Dinner event
Barack Obama
U.S. President during the 2011 White House Correspondents' Dinner
Excelerate Energy
U.S.-based firm developing Iraq's first LNG import terminal
Iraq’s Ministry of Electricity
Iraqi ministry that signed an agreement with Excelerate Energy
Iraq’s Oil Ministry
Iraqi ministry with a senior figure commenting on the LNG project
Washington
Refers to the U.S. government's foreign policy and interests
Tehran
Refers to the Iranian government and its influence
Beijing
Refers to the Chinese government and its influence
US Builds Energy Foothold in Iraq with New LNG Project

↳ Why This Matters

This strategic U.S. energy project in Iraq aims to reshape regional geopolitics by reducing Iranian and Chinese influence, potentially altering global energy flows and challenging China's Belt and Road Initiative in the Middle East.

Key facts

  • The U.S. is developing Iraq's first liquefied natural gas (LNG) import terminal.
  • Excelerate Energy, a U.S. firm, will manage the project, financing, and operation.
  • Operations are scheduled to begin in the second quarter of 2027.
  • The terminal will have a guaranteed regasification capacity of 500 million standard cubic feet per day.
  • The project is seen as a strategic move by the U.S. to counter Iranian and Chinese influence in Iraq.

The United States is quietly advancing a significant energy initiative in Iraq, centered around the construction of the country's first liquefied natural gas (LNG) import terminal. Developed, financed, and operated by the U.S.-based Excelerate Energy, the project is slated to commence operations in the second quarter of 2027. This development is viewed by Washington as a strategic move to diminish the influence of Iran and China in Iraq and to reassert U.S. energy diplomacy in the Middle East.

The project, located at the Port of Khor Al Zubair, has an initial budget of $450 million and is designed to handle 500 million standard cubic feet per day (MMscf/d) of regasification capacity, with Iraq committing to a minimum daily offtake of 250 MMscf/d. The U.S. sees this LNG hub as a critical tool to counter the economic and political ties Iraq has forged with Iran and China, particularly through agreements like the 'Oil for Reconstruction and Investment' and the 'Iraq-China Framework Agreement'. These deals have historically allowed Iran to circumvent sanctions by disguising its oil exports as Iraqi oil, a practice facilitated by shared oil fields.

Furthermore, the U.S. initiative aims to disrupt China's 'Belt and Road Initiative' in the region by fostering normalization deals between Arab states and Israel, brokered by Washington. The U.S. is strategically positioned to lead this effort, especially given infrastructure damage to regional LNG suppliers and its own status as the world's leading LNG exporter. Projections indicate U.S. LNG export capacity could double by 2031 compared to 2024 levels, underscoring its growing role in global energy markets.

Frequently asked questions

The primary goal is to establish a U.S. energy foothold in Iraq, reduce Iranian and Chinese influence, and reassert U.S. energy diplomacy in the Middle East.

The terminal is being developed, financed, and will be operated by the U.S.-based company Excelerate Energy.

Operations are scheduled to commence in the second quarter of 2027.

The U.S. sees it as a way to counter Iran's and China's influence in Iraq and to challenge China's Belt and Road Initiative in the Middle East.

What Happens Next

01Operations at the LNG import terminal are scheduled to commence in the second quarter of 2027.
02Excelerate Energy will manage engineering, procurement, dredging, and site clearance activities.
03The U.S. plans to leverage this project to foster normalization deals between Arab states and Israel.
CME Headlines
  • WTI Crude Oil futures drop as Middle East supply risks linger.
    18 Aug · 8:50 PM
  • WTI Crude Oil futures drop as Middle East supply risks linger.
    18 Aug · 8:50 PM
  • Copper futures drop to cycle lows ahead of FOMC minutes.
    18 Aug · 8:37 PM

How It Developed

The U.S. is undertaking a new energy project in Iraq with minimal publicity.
Excelerate Energy, a U.S.-based firm, will develop, finance, and operate Iraq's first LNG import terminal.
Operations are set to commence in the second quarter of 2027.
The project at the Port of Khor Al Zubair has an initial budget of $450 million, with potential for increase.
The facility is designed to handle 500 million standard cubic feet per day of regasification capacity.
Iraq has committed to a minimum daily take of 250 million standard cubic feet per day.
The U.S. aims to weaken the links between Iraq and Iran, and replace Iran and China as Iraq's key superpower relationship.
Establishing an LNG hub in Iraq is seen as a way to loosen Iran's and China's grip on the country.

Sources

T1
The U.S. Is Quietly Building a New Energy Foothold in IraqOilPrice.com

Related Stories

Iraq Approves Three-Month Crude Export Mechanism
18 Aug · 10:21 PM
China Boosts Fuel Exports as Domestic Stockpiles Swell
18 Aug · 8:56 AM
Gulf Oil Producers Bypass Hormuz Amid Rising Risks and Freight Costs
18 Aug · 5:16 PM
Ukraine eyes Russian LNG terminals as EU ban looms
18 Aug · 6:31 PM
Gulf Oil Giants Expand Overseas Reserves Amid Iran Conflict
18 Aug · 2:16 PM