Key facts
- More than 200 meters of the Crimea Bridge road span lie wrecked in 9 meters of water, per The Kyiv Independent.
- Only the road span was destroyed; rail traffic resumed, though the extent was unclear, the report said.
- All ferry traffic across the Kerch Strait was canceled on November 18 because of bad weather, authorities said.
- Kremlin spokesperson Dmitry Peskov said the bridge would be rebuilt even better than before.
- Ukrainian forces on November 17 reportedly damaged another bridge linking Crimea to Rostov-on-Don via Taganrog.
- Engineers told RFE/RL the road span's best-case repair time is about a year.
Ukrainian missile and drone attacks in several waves on November 16 and 17 wrecked more than 200 meters of the road span of the Crimea Bridge, leaving an asphalt-and-steel debris field in the Kerch Strait shipping channel, The Kyiv Independent reported. Only the road span was destroyed; rail traffic resumed, though the report said it was unclear to what extent.
The bridge, completed in 2018, carries road and rail across 19 kilometers of Black Sea waterway and was the only direct land route from the Russian mainland to Crimea until the February 2022 invasion. Russia occupied the peninsula in 2014. All ferry traffic across the strait was canceled on November 18 because of bad weather, authorities said.
Brian Clark, a former US naval officer at the Hudson Institute, said the damage looked as though it may have compromised the bridge's structural integrity and that travel across it was quite possibly unsafe. Sam Rigby, a professor of engineering at the University of Sheffield, said the attack targeted a much larger span of higher structural complexity than earlier strikes.
Kremlin spokesperson Dmitry Peskov said the bridge would be rebuilt even better than before. Ukraine's military command said part of the structure now lies underwater.
Infrastructure engineers told RFE/RL the road span's best-case repair time is about a year. David MacKenzie, a senior technical director at the British engineering consultancy COWI, said a new span would have to be assembled on the Azov Sea shoreline and floated to site, and that clearing the wreckage blocking the strait could take a week or two absent bad weather or Ukrainian threats.
